CAD check-in and check-out guide

How to Check In and Check Out CAD Files in Nora IPLM

Reserve and unreserve CAD files in Nora IPLM to control edits, prevent conflicts, and keep engineering data synchronized.

Nora IPLM CAD check-in and check-out workflow
01Launch services+

Start Nora IPLM Desktop Services and confirm the system tray icon is running.

02Connect CAD+

Select the CAD application from the Desktop Widget or access Nora IPLM inside the CAD environment.

03Sync data+

Use Get Data and Sync Data to retrieve and synchronize the CAD structure with Nora IPLM.

04Check out+

Reserve selected objects or reserve the full structure before editing CAD data.

05Check in+

Unreserve the parent or root item and its children after completing the required changes.

Controlled CAD collaboration

Reserve and unreserve CAD files in Nora IPLM

The Nora IPLM Desktop Services application allows engineers to securely manage CAD files by reserving (checking out) and unreserve (checking in) objects directly from the Desktop Widget or supported CAD applications. Reserving an object prevents other users from modifying it, ensuring controlled collaboration and maintaining data integrity throughout the design process.

By using the Reserve and Unreserve commands, engineering teams can avoid conflicting changes, maintain a single source of truth, and ensure that the latest version of each CAD file is always available within Nora IPLM. This workflow supports efficient collaboration while providing complete control over engineering data and product structures.

1Reserve CAD files before making changes to prevent conflicting edits.
2Unreserve CAD files after updates so the latest work is available in Nora IPLM.
3Use Reserve Structure to lock selected objects and related child items.
4Use Unreserve Structure to check in parent objects and children together.
5Keep CAD structures synchronized with the latest product information.
6Maintain controlled collaboration across supported CAD tools.

Follow the source guide

How to Check In and Check Out CAD Files in Nora IPLM

Follow these steps in the same order as the Word document.

1

Double-click on the “Nora IPLM Desktop Services” icon on your desktop to launch the application.

Launch Nora IPLM Desktop Services.
Launch Nora IPLM Desktop Services.
2

Confirm the application is running by checking for its icon in the system tray.

Confirm the application is running.
Confirm the application is running.
3

Open the settings and make sure to replace the default URL with your tenant URL.

Open settings and update the tenant URL.
Open settings and update the tenant URL.
4

Open the Desktop Widget and select the required application from the "Select App" dropdown to start the integration from the Nora IPLM platform. Alternatively, launch your supported CAD application (such as SolidWorks, Solid Edge, CATIA, or Creo) and access the Nora IPLM Add-In directly from within the CAD environment.

Open the Desktop Widget and select the required application.
Open the Desktop Widget and select the required application.
5

Open the required CAD model or assembly.

Open the supported CAD application.
Open the supported CAD application.
Access Nora IPLM from the CAD environment.
Access Nora IPLM from the CAD environment.
Open the required CAD model or assembly.
Open the required CAD model or assembly.
1 / 3
6

Click Get Data to retrieve the latest product information, then select Sync Data to synchronize the CAD structure with Nora IPLM.

Click Get Data to retrieve the latest product information.
Click Get Data to retrieve the latest product information.
7

Use the “Reserve” (Check-Out) command to reserve all the selected objects.

Note: Reserving an object locks it for editing, preventing other users from making changes until it is unreserved. Using the “Reserve Structure” command, reserve the selected Objects along with all its children in the structure/BOM.
Use Reserve to check out selected objects.
Use Reserve to check out selected objects.
Use Reserve Structure to reserve selected objects and children.
Use Reserve Structure to reserve selected objects and children.
1 / 2
8

After making the required changes to the reserved items, Select the parent or root item and click on “Unreserve Structure” (Check-In) command to unreserve the Selected Object along with its children.

Select the parent or root item after making changes.
Select the parent or root item after making changes.
Use Unreserve Structure to check in selected objects and children.
Use Unreserve Structure to check in selected objects and children.
1 / 2

FAQ

Frequently asked questions

Quick answers for CAD check-in and check-out workflows in Nora IPLM.

What does check-out mean in Nora IPLM?

Checking out is performed with the Reserve command. It locks the selected CAD object for editing and prevents other users from changing it until it is unreserved.

What does check-in mean in Nora IPLM?

Checking in is performed with the Unreserve command. After the required changes are complete, the object is unreserved so the latest version can be available in Nora IPLM.

When should I use Reserve Structure?

Use Reserve Structure when the selected parent object and its children in the structure or BOM need to be reserved together before editing.

Can this workflow be started from supported CAD applications?

Yes. The workflow can start from the Desktop Widget or directly from supported CAD applications such as SolidWorks, Solid Edge, CATIA, or Creo.

Why should teams reserve CAD files before editing?

Reserving CAD files helps avoid conflicting changes, supports controlled collaboration, and keeps CAD data integrity intact during engineering work.

Control CAD edits with Nora IPLM.

Use Reserve and Unreserve workflows to check out and check in CAD files while keeping product data synchronized and protected.

This is a staging environment